Ibis

Constraints Management Strategy Reports and Publications

Following the completion of the Murray-Darling Basin Plan in 2012, the MDBA was requested to develop a Constraints Management Strategy to explore how the plan could deliver better environmental outcomes by allowing some overbank environmental flows. This section includes reports and publications relevant to this strategy.

2015/2016 Reports

Murray Darling Basin Authority Reports

MDBA Hydrologic Modelling of Relaxed Constraints - Methods and Results - Oct 2012
pdf
2770 Kb
MDBA Murray Darling Basin Plan 2012
pdf
1171 Kb
MDBA Preliminary Overview of Constraints to Environmental Water Delivery in the Murray-Darling Basin - Technical Support Document June 2013
pdf
4354 Kb
MDBA Constraints Management Strategy 2013-2024
pdf
5482 Kb
MDBA Constraints Management Strategy - Goulburn River Reach Report 2014
pdf
6725 Kb
MDBA Constraints Management Strategy - Priority Analysis - Method and Results Report 2014
pdf
2636 Kb
MDBA CMS Annual Progress Report 2013-14
pdf
1386 Kb
MDBA CMS Costing Project - Easement Costing Methodology 2014
pdf
971 Kb
MDBA CMS Prefeasibility - Cost Estimates Report 2014
pdf
542 Kb
MDBA CMS Prefeasibility - Flow Inundation Mapping and Impact Analysis - Technical Report
pdf
1188 Kb
MDBA CMS Prefeasibility - Goulburn - Estimate of the Cost to Establish Easement 2014
pdf
2935 Kb
MDBA CMS Prefeasibility - Regional Infrastructure Costing 2014
pdf
3734 Kb

 

Goulburn River Environmental Flows Hydraulics Study Reports

Goulburn River Environmental Flows Hydraulics Study - Topographic Data Review 2008
pdf
821 Kb
Goulburn River Environmental Flows Hydraulics Study - Asset Mapping - Data Collation and Review 2009
pdf
3564 Kb
Goulburn River Environmental Flows Hydraulics Study - Hydrologic Analysis - Streamflow Data Assessment and Tributary Flow Scenarios 2009
pdf
1492 Kb
Goulburn River Environmental Flows Hydraulics Study - Real Time Flow Management - Framework Scoping 2009
pdf
189 Kb
Goulburn River Environmental Flows Hydraulics Study - Potential Flood Damage Assessment 2010
pdf
954 Kb
Goulburn River Environmental Flows Hydraulics Study - Executive Summary - Environmental Flows Scenarios 2010
pdf
670 Kb
Goulburn River Environmental Flows Hydraulics Study - Hydraulic Model Construction and Calibration 2010
pdf
1793 Kb
Goulburn River Environmental Flows Hydraulics Study - Hydraulic Model Application and Affected Asset Assessment - Environmental Flows Scenarios 2010
pdf
803 Kb

Environmental Flow Recommendations for the Goulburn River below Lake Eildon 

Goulburn Environmental Flow Recommendations - Final Report 2003
pdf
3172 Kb

Environmental Flow Delivery Constraints Study: Goulburn, Campaspe and Loddon (Sinclair Knight Merz)

Goulburn Campaspe Loddon Environmental Flow Delivery Constraints Study - SKM Final Report 2006
pdf
1924 Kb
Goulburn Campaspe Loddon Environmental Flow Delivery Constraints Study - SKM Report Appendices 2006Goulburn Campaspe Loddon Environmental Flow Delivery Constraints Study - SKM Report Appendices 2006
pdf
2201 Kb

Evaluation of Summer Inter-Valley Water Transfers from the Goulburn River

Evaluation of Summer Inter-Valley Water Transfers from the Goulburn River - Final Report 2007
pdf
4125 Kb

Lower and Mid Goulburn River Papers

Overbank Flow Recommendations for the Lower Goulburn 2011
pdf
2849 Kb
Hydraulic Modelling Analysis for the Lower Goulburn River 2011
pdf
1774 Kb
Goulburn River below Eildon Flow Monitoring - Thiess 2011
pdf
5588 Kb
Mid Goulburn River Elevation Analysis 2012
pdf
2064 Kb
Lower Goulburn Rural Levees Assessment 2013
pdf
6675 Kb
Mid Goulburn River Flows Study - Issues Paper 2014
pdf
4364 Kb
Mid Goulburn River Flows study - Flow Recommendations 2014
pdf
4301 Kb

 

Hydraulic Modelling Analysis Graphs and Diagrams

Goulburn Hydraulic Model - Levee Bank Naming Map 2011
pdf
92 Kb
Goulburn Hydraulic Model - Levee Bank Alignment Analysis 2011
pdf
1224 Kb