Waterway

Constraints Management Strategy Reports and Publications

Following the completion of the Murray-Darling Basin Plan in 2012, the MDBA was requested to develop a Constraints Management Strategy to explore how the plan could deliver better environmental outcomes by allowing some overbank environmental flows. This section includes reports and publications relevant to this strategy.

2015/2016 Reports

Murray Darling Basin Authority Reports

MDBA Hydrologic Modelling of Relaxed Constraints - Methods and Results - Oct 2012
pdf
2769 Kb
MDBA Murray Darling Basin Plan 2012
pdf
1170 Kb
MDBA Preliminary Overview of Constraints to Environmental Water Delivery in the Murray-Darling Basin - Technical Support Document June 2013
pdf
4353 Kb
MDBA Constraints Management Strategy 2013-2024
pdf
5481 Kb
MDBA Constraints Management Strategy - Goulburn River Reach Report 2014
pdf
6724 Kb
MDBA Constraints Management Strategy - Priority Analysis - Method and Results Report 2014
pdf
2635 Kb
MDBA CMS Annual Progress Report 2013-14
pdf
1385 Kb
MDBA CMS Costing Project - Easement Costing Methodology 2014
pdf
970 Kb
MDBA CMS Prefeasibility - Cost Estimates Report 2014
pdf
541 Kb
MDBA CMS Prefeasibility - Flow Inundation Mapping and Impact Analysis - Technical Report
pdf
1187 Kb
MDBA CMS Prefeasibility - Goulburn - Estimate of the Cost to Establish Easement 2014
pdf
2934 Kb
MDBA CMS Prefeasibility - Regional Infrastructure Costing 2014
pdf
3733 Kb

 

Goulburn River Environmental Flows Hydraulics Study Reports

Goulburn River Environmental Flows Hydraulics Study - Topographic Data Review 2008
pdf
820 Kb
Goulburn River Environmental Flows Hydraulics Study - Asset Mapping - Data Collation and Review 2009
pdf
3563 Kb
Goulburn River Environmental Flows Hydraulics Study - Hydrologic Analysis - Streamflow Data Assessment and Tributary Flow Scenarios 2009
pdf
1491 Kb
Goulburn River Environmental Flows Hydraulics Study - Real Time Flow Management - Framework Scoping 2009
pdf
188 Kb
Goulburn River Environmental Flows Hydraulics Study - Potential Flood Damage Assessment 2010
pdf
953 Kb
Goulburn River Environmental Flows Hydraulics Study - Executive Summary - Environmental Flows Scenarios 2010
pdf
669 Kb
Goulburn River Environmental Flows Hydraulics Study - Hydraulic Model Construction and Calibration 2010
pdf
1792 Kb
Goulburn River Environmental Flows Hydraulics Study - Hydraulic Model Application and Affected Asset Assessment - Environmental Flows Scenarios 2010
pdf
802 Kb

Environmental Flow Recommendations for the Goulburn River below Lake Eildon 

Goulburn Environmental Flow Recommendations - Final Report 2003
pdf
3171 Kb

Environmental Flow Delivery Constraints Study: Goulburn, Campaspe and Loddon (Sinclair Knight Merz)

Goulburn Campaspe Loddon Environmental Flow Delivery Constraints Study - SKM Final Report 2006
pdf
1923 Kb
Goulburn Campaspe Loddon Environmental Flow Delivery Constraints Study - SKM Report Appendices 2006Goulburn Campaspe Loddon Environmental Flow Delivery Constraints Study - SKM Report Appendices 2006
pdf
2200 Kb

Evaluation of Summer Inter-Valley Water Transfers from the Goulburn River

Evaluation of Summer Inter-Valley Water Transfers from the Goulburn River - Final Report 2007
pdf
4124 Kb

Lower and Mid Goulburn River Papers

Overbank Flow Recommendations for the Lower Goulburn 2011
pdf
2848 Kb
Hydraulic Modelling Analysis for the Lower Goulburn River 2011
pdf
1773 Kb
Goulburn River below Eildon Flow Monitoring - Thiess 2011
pdf
5587 Kb
Mid Goulburn River Elevation Analysis 2012
pdf
2063 Kb
Lower Goulburn Rural Levees Assessment 2013
pdf
6674 Kb
Mid Goulburn River Flows Study - Issues Paper 2014
pdf
4363 Kb
Mid Goulburn River Flows study - Flow Recommendations 2014
pdf
4300 Kb

 

Hydraulic Modelling Analysis Graphs and Diagrams

Goulburn Hydraulic Model - Levee Bank Naming Map 2011
pdf
91 Kb
Goulburn Hydraulic Model - Levee Bank Alignment Analysis 2011
pdf
1223 Kb

Flow Foot Print Areas: Goulburn River - Lake Eildon to Murray

The interactive map below that shows flow foot print areas for environmental watering between 7,000 and 55,000 ML/d. This information is based modelling carried out in 2010 and 2015.

Open Larger Map

Note: Loch Garry and other outlet structures within the lower Goulburn levees are closed for modelled environmental flow events.

The Goulburn Broken CMA acknowledges and respects First Nations people and the deep connection they have with their land and waters.


We acknowledge the Yorta Yorta and Taungurung people and their ancestors/forbears as Traditional Owners of the land and waters in the Goulburn Broken Catchment (and beyond). We value our ongoing partnerships with Yorta Yorta Nation Aboriginal Corporation and Taungurung Land and Waters Council for the health of Country and its people.


We pay our respects to Elders past, present and emerging and acknowledge and recognise the primacy of Traditional Owners obligations, rights and responsibilities to use and care for their traditional lands and waters.

Shepparton
168 Welsford Street, PO Box 1752, Shepparton VIC 3630
T (03) 5822 7700
F (03) 5831 6254

Benalla
89 Sydney Road, PO Box 124, Benalla VIC 3672
T (03) 5822 7700

Yea
Shop 5/10 High Street, Yea VIC 3717
T (03) 5822 7700