River

Floodplain

This section includes resources relevant to floodplain management.

Flood Studies

Links and Downloads
Link Summary Format Size
pdf 5547 Kb
pdf 8959 Kb
pdf 7975 Kb
pdf 8522 Kb
pdf 1070 Kb
Appendix A Shepparton Retarding Basins - Locality Plan Appendix B Time of Concentration Calculations Appendix C IFD Table Appendix D PMF Summary Worksheet
pdf 2297 Kb
Appendix E Peak Flood Depth Maps
pdf 8243 Kb
Appendix E Peak Flood Depth Maps
pdf 7455 Kb
Appendix E Peak Flood Depth Maps
pdf 7023 Kb
Appendix F Peak Flood Velocity
pdf 8476 Kb
Appendix F Peak Flood Velocity
pdf 9013 Kb
Appendix F Peak Flood Velocity
pdf 7455 Kb
Appendix G ARR Hazardous to Children
pdf 8278 Kb
Appendix G ARR Hazardous to Children
pdf 8562 Kb
Appendix G ARR Hazardous to Children
pdf 7091 Kb
Links and Downloads
Link Summary Format Size
pdf 16217 Kb

Environmental Flow Study

Floodplain Management Strategy 2018-2028 and Strategy Renewal 2023-2028

The Goulburn Broken CMA acknowledges and respects First Nations people and the deep connection they have with their land and waters.


We acknowledge the Yorta Yorta and Taungurung people and their ancestors/forbears as Traditional Owners of the land and waters in the Goulburn Broken Catchment (and beyond). We value our ongoing partnerships with Yorta Yorta Nation Aboriginal Corporation and Taungurung Land and Waters Council for the health of Country and its people.


We pay our respects to Elders past, present and emerging and acknowledge and recognise the primacy of Traditional Owners obligations, rights and responsibilities to use and care for their traditional lands and waters.

Shepparton
168 Welsford Street, PO Box 1752, Shepparton VIC 3630
T (03) 5822 7700
F (03) 5831 6254

Benalla
89 Sydney Road, PO Box 124, Benalla VIC 3672
T (03) 5822 7700

Yea
Shop 5/10 High Street, Yea VIC 3717
T (03) 5822 7700

Back to top